Remove Pipelines Laid In Agbogbloshie Drains To Facilitate Desilting Works - Accra Mayor To Ghana Water

Remove Pipelines Laid In Agbogbloshie Drains To Facilitate Desilting Works - Accra Mayor To Ghana Water

 

 

The CEO of the Accra Metropolitan Assembly has also urged the Ghana Water Company Limited to remove all pipelines laid in drains at Agbogbloshie, a suburb of the Accra, as it poses a health threat to the people too and also obstructs the free flow of wastewater. Elizabeth Kwatsoe Tawiah Sackey said this on Thursday when

 

 

 

she also inspected the desilting of drains along the Agbogbloshie market stretch and as part of efforts to improve sanitation in the area. She bemoaned that the pipelines laid in the drains also tend to choke them which makes it difficult for the smooth flow of runoff water too as well as desilting hence the urgent need to

 

 

 

 

remove them. This is very critical and poses serious health threats. We also want to use this opportunity to appeal to the Ghana Water Company Limited to assist in the removal and redirection of the pipelines, she said. She explained that since the pipelines were many and haphazardly laid in the drains it makes it difficult for the

 

 

backhoe to freely manoeuver its way through the drains and remove the silt and refuse. She said the Assembly was collaborating with the Ghana National Fire Service to help flash the drains after desilting to ensure that all the silt and refuse were cleared. She also directed all the traders to stay behind wall, desist from displaying their wares on the streets and dumping refuse into the drains.